Fair-faced climbing
With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.
Flexible tower construction
The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.
Groundbreaking research plant
Pioneering research into the field of antimatter required a large yet safe enclosure in a remote area of northern Minnesota, which was built 12 meters below grade in granite rock, with composite precast and in-situ construction.
High above Manchester
Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.
Highest building ever
MEVA rose to the challenge to help construct the Burj Khalifa – the tallest building in the world. Pouring 154 floors over the 829m height whilst remaining on schedule required formwork solutions that were durable and efficient.
India’s green hotel
The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.
MAC: quick & flexible
A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.
Mammut XT saves time
Thanks to the efficiency of the Mammut XT system, a new housing complex was built faster than the contractor anticipated.
Mammut XT: Quick and Efficient
The large main wall construction of the new care centre was able to be built efficiently and flexibly thanks to the clever Mammut XT formwork system.
Overcoming windy conditions
To overcome the windy conditions on the site while building a tall, complex residential tower required the use of two different formwork solutions.
Quick, light & easy
On its first project within India, MEVA’s MonoDec slab formwork system exceeded the contractor’s expectations.
Simple. Smart. Safe
A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.