Project Case Studies

Our projects from around the UK.

Back to top
Construction of High Rise Admore Park in Singapore using MEVA Mac climbing system

Fair-faced climbing

With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.

Construction of Roche tower 2 at Basel Switzerland using MEVA climbing formwork

Flexible tower construction

The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.

Heavy duty climbing formwork used to build scientific plant in USA

Groundbreaking research plant

Pioneering research into the field of antimatter required a large yet safe enclosure in a remote area of northern Minnesota, which was built 12 meters below grade in granite rock, with composite precast and in-situ construction.

Construction of Deansgate Square, Manchester UK using MEVA's MAC climbing formwork system

High above Manchester

Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.

The Burj Khalifa in Dubai; the worlds tallest building

Highest building ever

MEVA rose to the challenge to help construct the Burj Khalifa – the tallest building in the world. Pouring 154 floors over the 829m height whilst remaining on schedule required formwork solutions that were durable and efficient.

Construction of the Royal Palace Mumbai India

India’s green hotel

The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.

MEVA Mac climbing formwork system used in the construction of 900 hay street hotel in Perth Australia

MAC: quick & flexible

A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.

Wall formwork to construct concrete residential housing in Austria

Mammut XT saves time

Thanks to the efficiency of the Mammut XT system, a new housing complex was built faster than the contractor anticipated.

Construction of care centre in Norway using MEVA wall formwork system

Mammut XT: Quick and Efficient

The large main wall construction of the new care centre was able to be built efficiently and flexibly thanks to the clever Mammut XT formwork system.

An image of MEVA's climbing formwork being used as a residential concrete building is taking shape in Naples Florida USA

Overcoming windy conditions

To overcome the windy conditions on the site while building a tall, complex residential tower required the use of two different formwork solutions.

White-Alpha-Office-Buildings-Slab-Formwork-MonoDec-India-MEVA

Quick, light & easy

On its first project within India, MEVA’s MonoDec slab formwork system exceeded the contractor’s expectations.

Concrete Formwork Construction of Rescue Tunnels in Germany

Simple. Smart. Safe

A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.

Load More