Our Projects
In the Philippines and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.
Select your region:
Eye-catching staircase – as if cast in one piece
A unique spiral staircase in Stuttgart, subject to high architectural concrete requirements, required meticulous planning, design and workmanship.
Fair-faced climbing
With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.
MAC: quick & flexible
A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.
High above Manchester
Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.
The Museum of the Future
The giant, oval Museum of the Future in Dubai contains seven floors, on top of a three-storey podium, with each storey varying in height. The key to success was careful planning, innovative Building Information Modelling of the 3D design and a combination of adaptable formwork solutions, to create the curved structure of this futuristic Museum.
Highest building ever
MEVA rose to the challenge to help construct the Burj Khalifa – the tallest building in the world. Pouring 154 floors over the 829m height whilst remaining on schedule required formwork solutions that were durable and efficient.
An architectural masterpiece
Substantial expansion of of The Vienna University of Economics and Business meant a requirement to extend the campus, with a further six buildings planned – four of which were erected using MEVA formwork and formwork solutions.
Extraordinary stadium design
MEVA worked with the contractor to design a cantilevered shoring system at FC Felcsút’s Stadium in Hungary that would allow the roof supports to be cast without damaging the playing field.
Accelerated commercial building
The contractor chose the MonoDec slab formwork system to accelerate their construction schedule on this commercial building in Bolivia.
Quick, light & easy
On its first project within India, MEVA’s MonoDec slab formwork system exceeded the contractor’s expectations.
Clear run to Versoud
A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.