Our Projects

In Australia, New Zealand and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.

Back to top
Special formwork construction using slab, wall and shoring systems at Pancho Stadium Hungary

Extraordinary stadium design

MEVA worked with the contractor to design a cantilevered shoring system at FC Felcsút’s Stadium in Hungary that would allow the roof supports to be cast without damaging the playing field.

India’s green hotel

The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.

Highest building ever

MEVA rose to the challenge to help construct the Burj Khalifa – the tallest building in the world. Pouring 154 floors over the 829m height whilst remaining on schedule required formwork solutions that were durable and efficient.

High above Manchester

Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.

Simple. Smart. Safe

A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.

Ecological, practical, good

A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA’s AluFix wall formwork system.

Exceptional bridge piers

A new interchange and bridge was constructed as part of a motorway upgrade and bespoke formwork is needed to create the bridge piers.

Complex vertical louvre wall

A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.

Heavy duty formwork props on display on bridge construction

Clear run to Versoud

A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.

Mammut XT: Quick and efficient

The large main wall construction of the new care centre was able to be built efficiently and flexibly thanks to the clever Mammut XT formwork system.

Factory building becomes living space

MevaDec facilitates the renovation of an old building in Steyr

Flexible tower construction

The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.

Load More
Close search and go back to site